Applicable

Throughout the Cooperative’s service area for qualifying members in accordance with the Cooperative’s membership agreement, Bylaws, policies, regulations, and the Conditions of Service set forth herein, as well as applicable Rules of the Wyoming Public Service Commission.

Available

To irrigation members located adjacent to the Cooperative’s three-phase lines, providing the Cooperative has sufficient available capacity and all subject to the established rules and regulations of the Cooperative covering this service. Election to receive service for the upcoming irrigation season on this schedule must be received by the Cooperative around March 1st, each year, as announced in the Cooperative’s newsletter.

Type of Service

Three-phase, 60 hertz, at standard secondary voltage. Single-phase will be allowed at certain locations and limited horsepower.

Monthly Rate

Local Distribution Service

 

Apr - Oct

Nov-Mar

Grid Access Charge

$90.00 / month

$0 / month

On-Peak Delivery Charge (12:00 - 10:00 p.m.)

$0.03048 / kWh

$0.028 / kWh

Off-Peak Delivery Charge

$0.03048 / kWh

$0 / kWh

Peak Capacity Charge

$0 / NCP kW

$0 / NCP kW

Transmission Service

On-Peak Delivery Charge (12:00 - 10:00 p.m.)

$0.09445 / kWh

$0.02491 All kWhs

Off-Peak Delivery Charge

$0.000 / kWh

$0 / kWh

Peak Capacity charge

$0 / NCP kW

$0 / NCP kW

Power Generation Service

On-Peak Energy Production Charge (12:00 - 10:00 p.m.)

$0.14508 / kWh

$0.07208 / kWh

Off-Peak Energy Production Charge

$0.05496 / kWh

$0 / kWh

Peak Capacity charge

$0 / NCP kW

$0 / NCP kW

Bundled kWh and kW rates (for informational purposes only)

All On-Peak kWh (12:00 - 10:00 p.m.)

$0.27001 / kWh

N/A

All Off-Peak kWh

$0.08544 / kWh

N/A

Nov - Mar All kWhs

N/A

$0.12499 / kWh

Peak kW

$0 / NCP kW

$0 / NCP kW

On-Peak Time – The on-peak timeframe for this rate is 1:00 p.m. to 9:00 p.m.

Off-Peak rates will be charged 9:01 p.m. to 12:59 p.m. Monday through Saturday, all day on Sunday, and all day on the following holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day.

Adder

If a member elects to incur an additional charge for purchase of “Renewable Energy” the charge will be $0.003 per subscribed kWh not to exceed total monthly usage.

Tariff Rate Rider
This rate schedule is subject to the Tariff Rate Rider set forth on Sheet Nos. 79, 81, 81a, and 81b.

Minimum Monthly Charge

The minimum charge shall be the highest of the following:

  1. The distribution monthly grid access charge.

  2. The contract minimum in accordance with the Cooperative’s line extension policy.

Determination of Billing Demand (Non-coincident peak demand)

The billing demand shall be the maximum kilowatt demand established by the member for any period of fifteen consecutive minutes during the month for which the bill is rendered, as indicated or recorded by a demand meter and adjusted for power factor as follows:

Power Factor Adjustment

The member agrees to maintain a power factor of not less than 90%, and the Cooperative reserves the right to measure such power factor at any time. Should such measurements indicate that the power factor of the member is less than 90%, the member agrees, upon sixty days’ written notice, to correct such power factor to 90%, or if the Cooperative shall so elect, an adjustment is made by taking the demand recorded by the meter, multiplied by 90%, and divided by the percent power factor, then subtracting the recorded demand and multiplying that result by the demand rate.

Conditions of Service

In those cases where it is necessary to extend or reinforce distribution lines, service will be furnished only under the following conditions:

  1. The member shall give satisfactory assurance supported by a written agreement for a period of not less than five years.

  2. Motors having a rated capacity in excess of ten horsepower must be three-phase.

  3. All wiring, pole lines, wires, and other electrical equipment beyond the service point will be considered the distribution system of the members and shall be furnished and maintained by the member.

  4. Capacitors are required on motors of 20 horsepower or greater.